Schedule presentation reports to run
You can schedule reports to run automatically at a specified time or interval. Scheduled reports:
- Reduce the need for an individual to be responsible for generating specific reports.
- Are useful if a large number of reports need to be generated against the same date range.
For each presentation report that you schedule, a scheduled job definition is created. Among other details, this definition determines the date range included in the report, when and how often the report runs, to whom the report is distributed.
When you schedule a report, the scheduled job is added to the
page, where you can monitor, disable, or edit existing jobs. See Track scheduled presentation reports in the Job Queue.