Selecting reports

On the Report Selections tab:

Steps

  1. Enter a Job name that uniquely identifies this scheduled job. The name can be a maximum of 100 characters.
  2. Drill down through the list of report in the Report catalog tree and select a report.
    Use the Search option above the report list to find a specific report.
  3. Click the right arrow (>) to move the report to the Selected reports list.
    Note: Reports saved with a static date range (for example, 2018/ 09/01 - 2018/09/30) cannot be scheduled. If you move a report with a static date range to the Selected reports list, a warning appears.

    Continue to select and move reports to the Selected reports list until all reports for the job are listed. A maximum of 6 reports can be added.

    The date range applied to the report when it was created is used when the report is generated by the job.

  4. Click Next to open the Scheduling Options. Optionally, click Scheduling Options.