Setting the schedule
Steps
-
Select a Frequency for the job. Subsequent options are determined by selected frequently.
Frequency Options Daily The job will run each day of the week. Weekly (default) Click each day of the week the job is to run. Monthly Either:
Select how frequently the job should run, in a range of every month to every 12 months, then click each day of the month the job is to run.
Or:
Select how frequently the job should run, in a range of every month to every 12 months, then select a frequency and a day of the week. For example, you could run the report every 2 months on the 2nd Tuesday of the month.
- Select a Starting date for the job from the calendar that displays when the file is accessed. The current date is provided by default.
-
Select a Start Time that will be used when the job is schedule. The job begins according to the time on the management server.
Note: To start generating the scheduled reports today, select a time late enough that you can finish creating or editing the job before the start time.
Note that if multiple jobs are scheduled to run at the same time, one or more may fail. In this case, use the Run Now option to run the failed job and view the report on the Review Reports page. Also, consider changing the Start Time for that job.
-
Select the Ending option for the job.
Option Description Never (default) The job continues to run indefinitely, according to the established schedule.
To discontinue the job at a future time, either edit or delete the job.
On Set the date when the job stops running. The job will not be rescheduled to run after this date. After Select the number of times to run the job. After that number of occurrences, the job does not run again, but it stays on the
Scheduler page until you delete it.
- Click Next or Recipients to navigate to the next tab.