Adding stacking module to current environment
If you have already deployed the X10G appliance and want to add stacking modules into the current environment, follow these steps.
Steps
- Set up LACP on uplink switch-related ports.
- Insert stacking module and connect stack cable.
- Wait a few minutes and connect to master switch.
- Configure port channel. See Configuring switches from factory default configuration.