Adding stacking module to current environment

If you have already deployed the X10G appliance and want to add stacking modules into the current environment, follow these steps.

Steps

  1. Set up LACP on uplink switch-related ports.
  2. Insert stacking module and connect stack cable.
  3. Wait a few minutes and connect to master switch.
  4. Configure port channel. See Configuring switches from factory default configuration.