Scheduled jobs in presentation reports failed
If one or more scheduled jobs cannot run successfully in presentation reports, the Health Alert Summary on the System tab Status > Dashboard page displays a warning message.
Scheduled jobs may fail for a variety of reasons, such as:
- Email server information has not been configured on the page. See Configuring reporting preferences for instructions.
- There is insufficient disk space on the management server machine to generate presentation reports. See Inadequate disk space to generate reports for more information.
- Connectivity with the Log Database has been lost. See No Log Server is installed for a Policy Server for more information.
- The configured email server is not running. Work with your system administrator to resolve the problem.
To find out which job has failed, go to the
page.- If known problems have been resolved, mark the check box for the failed job, and then click Run Now to try the job again.
- Click the Details link for the failed job to display the Job History page, which gives information about recent attempts to run the selected job.