Setting the date range

Use the Date Range tab of the page Presentation Reports > Scheduler to set the date range for the job. If you selected Once in the Schedule Report tab, the Specific dates field displays the report date specified on that tab.

If you selected a recurring report schedule, you can specify the number of periods to report in the Relative dates field (Current, Last, Last 2, and so forth), along with the type of period (Days, Weeks, or Months). For example, the job might cover the Last 2 Weeks or Current Month.

Week represents a calendar week, Sunday through Saturday. Month represents a calendar month. For example, Current Week produces a report from Sunday through today; This Month produces a report from the first of the month through today; Last Week produces a report for the preceding Sunday through Saturday; and so forth.

After setting the date range for the job, click Next to display the Output tab.